Re: 4758163 投稿者:winter pile installation 投稿日:2026/11/04(Wed) 00:55
No.184063
No.184063
pile foundation installation – turnkey screw pile foundation with a 25-year warranty.
Mandatory control screwing, geodetic control. Shaft and head concreting